subsribe_popup_title
subsribe_popup_description
subsribe_popup_description2

Process Facilities of the SGT Transit Gas Pipeline System

  • Five of Gas Compressor Stations located near Kondratki, Zambrów, Ciechanów, Włocławek and Szamotuły, of a total output power of 600 MW – currently installed: 4 turbo-compressor units at the Kondratki Station and 3 units at each of the other stations;
  • gas metering station at the Kondratki compressor station and system metering and regulating stations at compressor station in Włocławek and in Długa Goślina, as well as the settlement node in Lwówek Wielkopolski
  • Five of compressor stations` connection units with pig launching and receiving chambers and 33 valve stations (including one double station), equipped with block valve sets
  • Seven of cathodic protection stations (including one reserve station)
  • Process communication system
  • System Control and Data Acquisition (SCADA) system
  • Central Control Room in the Administration Building in Warsaw
  • Warehouse base in Włocławek